DESIGNING A LABORATORY
Designing a laboratory is not as simple as it might appear at the first glance. There are a lot of aspects to consider. Perhaps most importantly, the end-user must be assured that the laboratory was designed to ensure safety, and the furniture with different engineering solutions is there to enhance efforts. Dynamic Enterprises offers a turnkey solution to build fully operational laboratories. The standard process of laboratory designing to installation is described below. It may take from 2 to 18 months depending on the size of a project.
PREPARE LAYOUT
The first step is detailed planning. Creating the layout of laboratory furniture includes more than simply arranging where the furniture will be placed. We (furniture supplier), Consultant and the End-user must work together during this step.

PREPARE SPACE
When the prepared plans satisfy the needs of the end-user, the construction or reconstruction of the space may start. The end-user should observe the quality of work during the construction in order to avoid future problems.

INSTALLATION
The furniture would be delivered and assembled when all the construction works are complete on the site. If other works are still ongoing, it may raise the risk of damaging it. AllĀ furniture must be checked against the confirmed project.